ARKData Centers
AI-ready data center

Built to run the heaviest AI workloads

Infrastructure engineered for high-density GPU clusters, with hybrid cooling ready on delivery: no technical debt, no retrofit.

NVIDIA H100 NVIDIA H200 NVIDIA B200 30–100 kW per rack Liquid cooling
Illustration of an AI-ready GPU rack with liquid cooling
GPU rack · liquid cooling
Animated illustration of a GPU rack liquid cooling loop
Chilled water · closed loop
Architecture

True high density, from day one

Our architecture was designed for AI end to end: not adapted later. That means native chilled water, on-demand liquid distribution to racks, and full density with zero downtime and zero retrofit.

  • Chilled water: liquid distributed to racks on demand, with zero downtime.
  • From 30 to 100 kW per rack, scalable rack by rack, ready for training and inference.
  • Support for NVIDIA H100, H200, and B200, with full density scaled to your demand.
  • Modular expansion: you grow without disruptive construction.
  • N+1 redundancy in power and cooling · concurrently maintainable.
Size my cluster
100kW
max density per rack
99,982%
uptime · Tier III
N+1
redundancy in power and cooling
24/7
monitoring and support
<5ms
ms latency in Greater SP
100%
certified renewable energy
Capabilities

What makes the data center AI-ready

Cooling

Hybrid air + liquid cooling

Chilled water with on-demand liquid distribution to racks and zero operational downtime.

Density

True high density

From 30 to 100 kW per rack, scalable rack by rack, ready for large training and inference clusters.

Expansion

Growth without construction

Modular architecture: add racks and density at the pace of your project, without disruptive construction.

Reliability

Tier III · 99.982%

N+1 redundancy in power and cooling. Concurrently maintainable, enterprise-grade, certified by the Uptime Institute.

Who it's for

Who runs AI at ARK

IA

AI labs and startups

Science

Research and academia

Finance

Financial markets

Cloud

Cloud providers

Optional GPU leasing: install your own GPUs in the AI-ready space or lease GPU capacity directly from ARK. Either way, the critical infrastructure is on us.

Need high-density space for your cluster?

Size my cluster [email protected] · BR +55 21 97295-1717